Data Center & Power Infrastructure

Switchgear, transformers, cooling: moved to site, set in place.

The buildout reshaping power and compute runs on heavy, high-value, long-lead equipment that has to arrive in sequence and land in exactly the right spot. LGX orchestrates that cargo end to end, from procurement and import through heavy haul, the crane spot, and on-site placement. One team is accountable for the whole move.

On the manifest

  • Power transformers
  • Switchgear & e-houses
  • Cooling equipment
  • Generators & gensets
  • UPS, busway & long-lead electrical
  • Modular & prefab

What we move

The equipment a buildout lives or dies on.

Power transformers

GSU and distribution transformers: heavy, oversized, sensitive to shock and tilt. Routed, permitted, and set with impact monitoring where required.

Switchgear & e-houses

Medium- and high-voltage switchgear lineups and pre-assembled e-houses. Handled to protect alignment and seals.

Cooling equipment

Chillers, CRAH/CRAC units, cooling towers, and dry coolers. Staged and sequenced to the mechanical install.

Generators & gensets

Standby and prime power packages, fuel and enclosure assemblies.

UPS, busway & long-lead electrical

High-value components consolidated and staged against the install schedule.

Modular & prefab

Skidded plant, prefabricated power modules, and containerized systems.

Why it’s not just freight

Long lead times, hard sequence, no room for a missed pick.

The problem

Power and cooling equipment is over-dimensional, over-weight, and on long procurement lead times. Often imported, often against a site that isn’t ready until it is, then needed fast and in sequence. A transformer that arrives before the pad is poured is a storage problem; one that arrives after the crane demobilizes is a schedule problem. The pieces have to converge.

How LGX handles it

We plan from the on-site date backward: import and customs coordination, heavy haul with the right trailer and permits, a lift plan engineered to the set, and our own yard and 50-ton crane in Humble to stage and buffer cargo so it lands when the site can take it. Not before, not after. Our coordinators are on site for the set.

The buffer window

OriginShipsImport and customs coordinated; the lead time starts running.
Humble, TXYard: the bufferReceived, held, and consolidated to a site-ready sequence.
SitePad pouredThe site can take it. Not before.
SiteCrane on siteLift plan engineered to the set, supervised on the day.
PlacementSetSpotted and set with the electrical and mechanical team.

Before the pad is poured: a storage problem. The yard absorbs it.

After the crane demobilizes: a schedule problem. The sequence prevents it.

The scope

Procurement to placement, owned by one team.

Import & forwarding

Overseas-sourced equipment: ocean FCL, breakbulk, or charter; customs entry coordinated through partner.

Forwarding →

Laydown & staging

In our own yard: buffer long-lead pieces and consolidate to a site-ready sequence.

Yard & storage →

Heavy haul

To site: flatbed, step deck, RGN, multi-axle; route survey, permits, escorts.

Heavy haul & OOG →

Lift plan & crane

At the site: engineered to the set, supervised on the day.

Crane coordination →

On-site placement

With the electrical/mechanical team: spotting, setting, and schedule integration.

On-site coordination →

Scope wrap-up

Documentation, demobilization, sign-off.

Closed out

Reach

Wherever the site is.

Data-center and power buildouts are happening across the country and around the world, and that’s where we work: national and international, planned project by project from a Humble, TX base with our own yard and crane behind it. We’re not fenced to a region or a lane.

  • Base: Humble, TX
  • Own yard + 50-ton crane
  • National & international

Frequently asked

Questions buildout teams ask first.

Can you stage long-lead equipment until our site is ready?

Yes. Our own laydown/storage yard and 50-ton crane let us receive, buffer, and consolidate transformers, switchgear, and cooling equipment, then release it to site in the sequence the install needs, instead of you paying demurrage or scrambling for space.

Do you handle imported equipment end to end?

Yes. Ocean FCL, breakbulk, or charter on the import; customs entry coordinated through our partner customs broker; then heavy haul, crane, and on-site set under one project team.

Can you move and set the transformer itself?

We arrange the heavy haul, engineer the lift plan, coordinate the crane, and put our people on site for the set. We’re asset-light on trucks, matching the right equipment to the piece, and asset-backed on yard and crane where it counts.

What regions do you cover?

National and international. We plan each scope from the site backward through whichever origin the equipment ships from. Home base is Humble, TX; the work is not lane-fenced.

Building out power or compute?

Send us the equipment list, where the site is, and the dates. We’ll come back with a plan to get it there in sequence and set in place. One team accountable.